Affordable Grid Modernization, Part I

Let’s be honest. Some grid operators are still under the impression that reconductoring with advanced conductors is expensive. The data tell a different story. In fact, the reality is the exact opposite; today’s advanced conductors yield net savings.

Fortnightly Magazine – August 2025

This is important to understand, because if grid operators overlook advanced conductors because they think they’re too expensive, they’re limiting their ability to address challenges that are only becoming more acute, especially when it comes to grid modernization and capacity expansion.

It’s a familiar story. America’s transmission infrastructure is aging, and significant new capacity is needed to meet growing demand and alleviate bottlenecks. Spending on transmission nearly tripled from 2003 to 2023. But a lot more is needed at a time when twenty percent of Americans are struggling with utility bills, and ten percent have received disconnect notices in the past twelve months.

A man in a light gray blazer and blue shirt speaks on stage with a microphone headset, gesturing with both hands against a colorful circular background.

Utilities need an affordable way to meet demand sooner rather than later by getting more out of their existing transmission corridors. Reconductoring with advanced conductors makes that possible by delivering more capacity and contrary to popular belief, with less CapEx.

More Capacity, Less CapEx

ACSS is commonly used for reconductoring projects today, but it comes with a significant drawback – thermal sag. When operating at higher temperatures to achieve increased capacity, ACSS conductors sag substantially. This often requires utilities to raise structure heights, strengthen crossarms, and/or modify foundations, which are expensive and time-consuming structure retrofits that dramatically increase project costs.

Electricity pylons in a grassy field under a blue sky with clouds

Advanced conductors solve this problem by enabling capacity increases without structural modifications. Their low thermal sag allows utilities to use existing structures while still achieving two to three times the capacity of traditional ACSR. 

The time and money saved on structures more than offsets the modest price premium of the conductor itself, resulting in overall project cost reductions up to thirty to forty percent compared to traditional reconductoring approaches. The result is a simple equation – more capacity with less capital expenditure.

Savings in Action

Recognizing its advantages, respected utilities across the country are adopting advanced conductor technology for major reconductoring projects.

In March 2021, Montana-Dakota Utilities completed an eleven-mile advanced reconductoring project on its two hundred thirty kilovolt transmission line in North Dakota. The project increased the line’s operating ampacity by seventy-eight percent, achieved 1.8 million dollars in savings, and was completed a full year ahead of schedule, minimizing both construction costs and service disruptions.

More recently in April 2024, Salt River Project (SRP) completed an eight-and-a-half mile advanced reconductoring project in Phoenix, Arizona. The project allowed SRP to maintain the fifty-year remaining service life of existing structures while reducing outage-related expenses and still achieving the significant capacity increase needed for growing demand.

Reliable Grid Future: Affordable Way to Invest

Today’s utilities are tasked with providing safe, secure, and affordable energy. Reconductoring with advanced conductors is the key to fulfilling that objective on terms that make sense now, and into the future.

In the next article in this three-part series, we’ll discuss why advanced conductors are not just for reconductoring. They can also provide the most affordable and effective option for new transmission buildout.

This article originally appeared in Public Utilities Fortnightly.

More blogs & articles.

See All Blogs & Articles
Lattice Structure
Article
03/01/26

Why Pre-Tensioning Matters in Composite Core Design

The evolution of conductor technology has been marked by a clear pattern: each generation attempting to solve the limitations of its predecessors while introducing new challenges. From the temperature constraints of 1908's ACSR to the excessive sag problems of 1970s ACSS, and the handling difficulties of 1990s composite cores, the industry has repeatedly faced the fundamental question of how to manage problems instead of solving them at their source.

High-voltage power lines and transmission towers run above a forested area with hills and a clear sky in the background.
Article
02/17/26

5 congested markets, 1 ready-to-scale solution

Grid congestion — the physical transmission constraints that force a shift from lower-cost generation to expensive, out-of-merit local units — drove over $12 billion in total market costs in 2024.

High-voltage power lines and pylons stretch across a hilly landscape at sunset, with a distant city skyline visible beneath a partly cloudy sky.
Article
02/15/26

What is Thermal Degradation and How Does It Impact Conductor Performance?

Every summer, as temperatures soar and air conditioners hum across the grid, transmission lines face one of their greatest tests. The conductors carrying power to millions of homes and businesses operate at extreme temperatures, often exceeding 180°C during peak demand. This intense heat affects utilities’ ability to provide power delivery today–and, in many cases, slowly, invisibly impacts the conductor's ability to perform reliably for decades to come.

Two people wearing hard hats stand in an industrial setting; one gestures while talking, and the other holds a laptop, listening attentively.
Article
01/06/26

From policy to performance: The regulatory push for advanced conductors

As skyrocketing demand, rising energy prices, and the urgent need for modernization challenge power grids, advanced conductors are emerging front and center on regulators’ desks.