How advanced conductoring can help the USA win the AI race

AI data centers are driving explosive electricity demand, exposing grid constraints nationwide. Advanced conductors offers the fastest, most cost-effective way to unlock transmission capacity at scale.

View Blogs

Key Highlights

  • AI data centers are increasing electricity demand exponentially, creating a critical need for expanded transmission capacity.
  • Existing grid infrastructure is insufficient, with transmission expansion lagging behind the rapid growth of data center loads.
  • Advanced conductors like AECC can double or triple transmission capacity without extensive new infrastructure, enabling faster deployment.
  • Reconductoring existing lines with advanced conductors offers a cost-effective, quick solution to alleviate grid congestion and reduce line losses.
  • Widespread adoption of advanced conductors could save consumers billions annually and support the US’s competitiveness in the AI era.
High-voltage power lines with blue glowing effects stretch across multiple towers against a sunset sky, illustrating electricity transmission.

By Jason Huang

The AI data center boom is creating unprecedented demand for electricity — and access to power has become the biggest constraint on America’s AI race. The nation’s grid simply wasn’t built to deliver power at the speed or scale these systems require. But there’s a solution that can unlock transmission capacity faster and more cost-effectively than any alternative: advanced conductoring.

The scale of the transmission challenge is already evident. In 2024, US data centers used 183 terawatt-hours (TWh), more than 4% of national electricity use — equivalent to Pakistan’s entire annual demand. By 2030, that consumption could surge 133% to 426 TWh. Already in Northern Virginia, the world’s largest data center market, wait times for electricity connection now stretch up to seven years. And across the nation, more than 2,600 gigawatts (GW) of energy and storage projects sit in interconnection queues — about twice the size of the entire existing grid.

As the United States Department of Energy’s (DOE) Speed to Power Initiative makes clear, transmission capacity — not just new generation — will define America’s competitiveness in the AI era. To understand how the US can meet this moment, it helps to look at the three strategies developers and utilities are pursuing today, and why only one can scale fast enough.

Three ways developers are working to meet the demand surge

Today’s AI-driven load growth has forced data center developers and utilities to rethink how and where they source power. Three approaches have emerged, each with strengths and some with more limits than others:

●     Solution A: Co-locating with existing generators. Some developers are siting facilities directly next to power plants, such as Microsoft reactivating a retired nuclear facility. This approach provides direct power without transmission bottlenecks, but opportunities are limited: It doesn’t scale and can only serve a fraction of planned capacity.

●     Solution B: Bringing your own power. Others are developing data centers with dedicated power generation, including natural gas plants or utility-scale solar and wind. This offers more control and can accelerate timelines. But it’s only a partial fix, especially as data centers look to develop closer to major urban centers to reduce latency and get closer to where compute needs to happen.

●     Solution C: Connecting “here” and “there” through transmission. In most cases, data centers are in one place and generators are in another. The grid is already strained, and congestion will intensify as AI loads rise. Even when new generation is built, limited transmission capacity determines how much power actually reaches high-growth regions.

Why fast access to power has become the defining constraint

Data center demand is rising so fast that it’s reshaping electricity load profiles and exposing long-standing structural weaknesses in the grid. This accelerating growth explains why today’s developer strategies — co-location, dedicated generation, and long-distance siting — can’t fully keep pace with the scale or speed of AI-driven demand.

Power density inside facilities is exploding, with rack-level loads jumping from 8–15 kilowatt (kW) to 80–100kW+ or more. At the same time, over 80 GW of data center capacity is under development and could come online by 2030. This rapid buildout is colliding with grid congestion that has already pushed wholesale electricity prices in major data center regions up as much as 267% over the past five years. In the PJM electricity market, increased demands contributed to a $9.3 billion price spike in the 2025–26 cycle, adding an estimated $16–$18 to some monthly residential bills, while average US residential prices rose 6% year over year as of August 2025 than during the same month a year earlier.

Meanwhile, reliability pressures are mounting. DOE officials warn that blackout risks could rise sharply by 2030 if firm power sources retire faster than replacements come online. And with America’s transmission capacity expanding at less than 1% annually — far short of the 4–7% growth needed — the system is increasingly unable to move power to the locations where data center clusters are forming. 

At its core, solving these grid challenges comes down to solving a basic equation: new data centers need power, new generation must be built, and transmission must connect the two.

●     New data centers create massive new loads that need power. AI demand is overwhelming transmission systems faster than utilities can respond.

●     New generation must be built to meet skyrocketing demand. But generation alone doesn’t solve the problem if that power can’t reach high-growth regions.

●     Current and new power must be able to reach data centers. Both new-build transmission and reconductoring of existing transmission rights of way (ROWs) need to de-bottleneck the grid to support data center load growth and overall grid reliability.Solutions A and B solve only slices of this equation. Solution C — expanding transmission capacity — is the only approach that solves the full system challenge.

Why advanced conductors are the fastest, most scalable solution

If the US wants to build transmission capacity at the speed AI requires, it needs solutions that scale quickly, cost-effectively, and within the constraints of existing infrastructure. This is where advanced conductors shine.

A combination of new build (important but slow) and reconductoring existing lines (cheaper, faster, easier) will be required. But reconductoring is where the greatest near-term impact lies — and where advanced conductor technology (such as aluminum encapsulated carbon core, or AECC) provides.

There’s no other viable alternative that unlocks so much new capacity so efficiently. AECC offers 2-3x the capacity of traditional ACSR while reducing line losses by up to half and limiting thermal sag at high temperatures. Much of this capacity can be unlocked without replacing or retrofitting existing structures, dramatically shortening timelines and minimizing environmental and permitting hurdles, lowering total project costs by 30–40%.

Advanced conductors deliver urgent “speed to power.” By expanding capacity on existing corridors, advanced conductors shorten data center interconnection timelines and strengthen grid reliability as AI load grows.

They improve the economics of new builds, too. Conductors make up just ~5% of project costs, yet they enable fewer and shorter structures — reducing steel, foundations, and labor. These efficiencies can lower total project costs by 10–20% while creating headroom for future growth.

And AECC delivers long-term systemwide savings. Nationwide adoption could cut consumer electricity costs by an estimated $2.2 billion annually through line loss reduction alone. Reconductoring with advanced conductors could enable 4x the interzonal transmission capacity expansion vs. greenfield new build transmission alone. That’s massive and exactly what the grid needs in this acute moment of surging demand from AI data center buildout.

All these attributes make reconductoring with advanced conductors the best near-term way to unlock large-scale capacity. It provides the speed, the scale, and the cost efficiency utilities and developers need right now.

Meeting AI’s energy challenge with reliable, cost-effective power

Data center developers and electric utilities should be shouting from the rooftops to reconductor America’s transmission grid with advanced conductors. Copper may wire the racks inside data centers, but AECC aluminum needs to power them.

Advanced conductors are the only technology that can deliver transmission capacity fast enough and efficiently enough to keep America competitive in the AI era.

About the Author

Jason Huang is founder and CEO of TS Conductor, a US-based leader in award-winning, next-generation advanced conductors for the world’s power grids. After earning his MS in materials science and engineering from UCLA and then both his MBA and PhD from The Ohio State University, Huang went on to roles with US government agencies such as NIST, to work on sensitive American defense aircraft like the F22 and F35, and to a series of technical and senior roles with companies such as Owens Corning, BAE Systems, Solvay, and CTC Global.

This article originally appeared in T&D World.

More blogs & articles.

See All Blogs & Articles
Lattice Structure
Article
03/01/26

Why Pre-Tensioning Matters in Composite Core Design

The evolution of conductor technology has been marked by a clear pattern: each generation attempting to solve the limitations of its predecessors while introducing new challenges. From the temperature constraints of 1908's ACSR to the excessive sag problems of 1970s ACSS, and the handling difficulties of 1990s composite cores, the industry has repeatedly faced the fundamental question of how to manage problems instead of solving them at their source.

High-voltage power lines and transmission towers run above a forested area with hills and a clear sky in the background.
Article
02/17/26

5 congested markets, 1 ready-to-scale solution

Grid congestion — the physical transmission constraints that force a shift from lower-cost generation to expensive, out-of-merit local units — drove over $12 billion in total market costs in 2024.

High-voltage power lines and pylons stretch across a hilly landscape at sunset, with a distant city skyline visible beneath a partly cloudy sky.
Article
02/15/26

What is Thermal Degradation and How Does It Impact Conductor Performance?

Every summer, as temperatures soar and air conditioners hum across the grid, transmission lines face one of their greatest tests. The conductors carrying power to millions of homes and businesses operate at extreme temperatures, often exceeding 180°C during peak demand. This intense heat affects utilities’ ability to provide power delivery today–and, in many cases, slowly, invisibly impacts the conductor's ability to perform reliably for decades to come.

Two people wearing hard hats stand in an industrial setting; one gestures while talking, and the other holds a laptop, listening attentively.
Article
01/06/26

From policy to performance: The regulatory push for advanced conductors

As skyrocketing demand, rising energy prices, and the urgent need for modernization challenge power grids, advanced conductors are emerging front and center on regulators’ desks.